Owner: Konterra Development, Anne Arundel County
Contact: Bruce Wright 443-871-2766
Contractor: Corman Construction
8400 feet of 16 inch HDPE sewer force main directionally drilled down the middle of Brock Bridge Road in Annapolis Junction/Jessup Maryland. The main portion of the work was completed on time and within specs. A 1500 foot river crossing through rock was realigned due to bridge interference and was completed at a later date by us.
DRILL TECH: Simply the LEADER in Horizontal Directional Drilling Maryland, Delaware, Virginia, North Carolina