Owner: Anne Arundel County
Contact: Bruce Wright, Chief Engineer – Cell 443-871-2766
Contractor: Schummer Inc
Engineer: Dewberry and Davis
This project consists of approximately 8500 feet of 22” HDPE and 1000’ of 16” HDPE directionally drilled down the middle of Benfield Blvd in Severna Park, Md. The longest bore was approximately 2500 feet. The project was completed on schedule.
DRILL TECH: Simply the LEADER in Horizontal Directional Drilling Maryland, Delaware, Virginia, North Carolina