top of page

Cox Creek Sewer Replacement

  • dt6987
  • Mar 2, 2012
  • 1 min read

Owner: Queen Anne’s County, Maryland

Alan Quimby-410-643-3535

Contractor: Drill-Tech, Inc.

The project consisted of (1) 24” fusible PVC conduit directionally drilled across the river at a depth of 45 feet. Total length of the bore was approximately 1200 feet. The project was completed on schedule.

DRILL TECH: Simply the LEADER in Horizontal Directional Drilling Maryland, Delaware, Virginia, North Carolina


 
 
 

Comments


bottom of page